Whether you’re looking for some expert advice on personal or corporate matters, or simply need that extra push from a professional consultant — you’ve come to the right place. As a well renowned Business Management Consultant, I provide my clients with all the advice and tools they need to make their best choices. Take a look at some of my work and call me today for a free consultation.
January 2014 – Present (3 years 1 month)
Project Manager (Contract)
Zespri International
Throughout this time I have been working on the following projects:
Major Cloud migration project running over 2 years, which included (but is not limited to):
- World first for moving production SAP environment into Azure Cloud
- .NET applications migrated to Azure
- Citrix XenApp migrated to Azure
- Office 365 migration for all mailboxes globally
- SharePoint migration to Azure
• SharePoint upgrade from 2007 to 2013
• Office 2013 rollout (in preparation for Office 365)
• Rollout of a new mobile app for the industry
• Rollout of Lync Enterprise Voice to NZ and Tokyo offices
• Migration of Signavio (process mapping tool) to Azure platform
February 2012 – June 2016 (4 years 5 months)
Throughout this time I have been working in a contract capacity on the following projects:
• Implementing an internal Help Desk team, reducing external outsource costs
• Network and server upgrades, replacing end-of-life equipment and moving to a dual data-centre environment to increase business continuity capability
• VMware upgrade – from vsphere 4 to vsphere 5
• Microsoft Exchange upgrade from Exchange 2007 to Exchange 2013
• Citrix virtualisation and upgrade – migration from physical servers to a virtual server environment, while upgrading from Citrix 4.1 to XenApp 6.5
• SAP virtualisation – migration from physical servers to a virtual server environment and upgrading to SQL Server 2012, increasing business continuity capability. Further details of the benefits obtained are captured within a Microsoft Case Study.
• Windows 7 and Office 2010 rollout – upgrading desktops, laptops and Citrix thin clients from Windows XP / Office 2003 to Windows 7 / Office 2010
• Creation of a central Incidents & Hazards Management Policy, together with implementing SAP portal changes to support the policy
• Accounts Payable automation – integration of a Kofax scanning solution with SAP, allowing scanned invoices to be captured, validated and work-flowed through SAP with minimal manual intervention
• Creation of a business case for the integration of weighbridge technology with SAP
• Streamlining the HR processes for performance management and remuneration through the use of technology
• Environmental policy audit – an internal audit of my client’s adherence to their environmental policy
• Citrix upgrade from XenApp 6 to XenApp 7.6
• Windows 10 / Office 2016 upgrade nationwide
• Security System upgrade to Gallagher Command Centre across multiple sites
June 2013 – January 2016 (2 years 8 months)
Throughout this time I have worked in a contract capacity on the following projects:
• System upgrade from MOSS 2007 to SharePoint 2013
• Windows 7 roll-out – upgrading desktops and laptops from Windows XP to Windows 7
• Implementation of the Ekahau temperature monitoring system for pharmaceutical fridges